Drawings, site safety and programme risk.
Construction data is visual and contractual. The wins are in reading drawings and specifications quickly, and in seeing site risk sooner.
A tender pack runs to thousands of pages across formats.
Safety and progress data is captured on phones, not systems.
Missed requirements at bid time become losses at delivery.
Surface obligations, exclusions and risk clauses across a full tender pack.
Detect PPE compliance and hazard conditions from site camera and phone imagery.
Compare site imagery against programme to flag slippage.
Answer queries from the contract documents with the clause referenced.
Construction assessments weigh document volume against how much of the useful data is images captured in the field.
Data sources we expect
Questions this template pushes on
These are suggestions surfaced alongside the questions — never pre-filled answers. The assessment still asks you everything, because a score built on assumptions you never confirmed is not a score you could act on.
The Construction & Engineering template sharpens the questions. Ten minutes gets you a feasibility score, an architecture and a costed plan.